Philip S. Miller Park

The master plan for Philip S. Miller Park includes the following:

  • 64,000 SF Field House with 18,000 SF indoor synthetic turf field; 9,000 SF indoor “play area” for gymnastics, aerobics, yoga, dance; 5,000 SF leisure/lap pool; 3,000 SF indoor playground and climbing wall; meeting rooms;
  • 2,850 SF Mill House with 60-person event space; small lounge;
  • 2,000-3,000 seat amphitheater with stage;
  • Pond with a re-circulating creek;
  • Xeric sculpture gardens;              
  • 4-field youth baseball/softball complex;              
  • Lighted sand volleyball courts;
  • 5 tennis courts;                 
  • Central plaza with spray park; turf-bermed play areas; picnic pavilions; seat walls; restrooms; art;
  • Adventure Playground with picnic pavilions; scramble/climbing walls; boardwalks; slides; climbing nets; mining maze; play tunnels; log steppers; forest tree house;
  • Sledding hill;
  • Natural turf playfields;
  • Synthetic turf athletic fields;
  • 4.50 miles of soft surface trail system;
  • 3.25 miles of paved pedestrian trail;
  • Tree house village;
  • Climbing structures;
  • Challenge hill climb course;
  • Castle Rock Year-Round Snow Sports Center.

Learn More:  The Story  |  Key Demographics

Grand Opening for Philip S. Miller Park was on October 25, 2014